Site migration in progress

30/11/2009

We are still testing the new location and synchronizing new files. The switchover is planned for approximately 6am GMT on Tue.

The site is likely to go down for about an hour or two. This is how long it takes to re-sync the database. Having less downtime will increase risk of data going missing.

Please, do not upload new templates, fonts or stock images until we are running off the new location, unless they can’t wait.

Leave a Reply